Se rendre au contenu

Upgrading & uprating of existing cable systems

http://odoo.e-cigre.org/web/image/product.template/5894/image_1920?unique=90d761d

The TB written by the WG B1.11 gives a simple step-by-step methodology with flowcharts in order to guide the engineer into an upgrading process of an existing UG cable system (uprating being considered as a subset of upgrading). The steps are described, from the definition of the target for upgraded situation, the assessment of the existing situation and the identification of issues, up to the selection of potential upgrading techniques, the evaluation of their impacts and the decision making. Practical examples are given. Conclusion is that each case is specific and must be studied with great care because of possible interference of parameters.

180,00 € 180.0 EUR 180,00 €

Not Available For Sale

Cette combinaison n'existe pas.

Conditions générales
Garantie satisfait ou remboursé de 30 jours
Expédition : 2-3 jours ouvrables