Skip to Content

Influence Of Shunt Capacitor Banks On Circuit Breaker Fault Interruption Duties

http://odoo.e-cigre.org/web/image/product.template/5817/image_1920?unique=07f42c5

WG A3.26 has studied the influence of a source side capacitor bank on the Transient Recovery Voltage (TRV) of a circuit breaker interrupting a fault. EMTP simulations of different network configurations have been performed. Mitigation means are discussed to limit the possible high voltage transients the network.

20.00 € 20.0 EUR 20.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days