HVDC connection of offshore wind power plants
The first wave of HVDC connected offshore wind power plants (WPPs) has been commissioned and many more are planned in the North Sea, along with other sites around the world. VSC-based HVDC has become the preferred solution for large offshore WPPs, with cable distances typically above 100 km (including both offshore cable and on shore cable to the converter terminal) to the AC grid connection point. This is largely due to several technology advantages offered by VSCs, when compared to other HVAC or HVDC options, resulting in a more economically attractive transmission solution. In addition, a number of HVDC submarine cable connections for power exchange between countries are being planned and the possibility of connecting WPPs to these interconnections, and to future HVDC grids, are being…