Se rendre au contenu

How does a HVDC cable system react on TOVs?

https://odoo.e-cigre.org/web/image/product.template/14559/image_1920?unique=2366757

As HVDC grids evolve into complex meshed networks, careful consideration is needed when introducing new test waveforms. While HVDC technology has advanced rapidly to 525 kV systems with high transmission capacities, introducing new test waveforms must be done cautiously due to the high cost, long duration, and risk of unnecessary testing requirements becoming permanent.

30,00 € 30.0 EUR 30,00 €

Not Available For Sale

Cette combinaison n'existe pas.

Conditions générales
Garantie satisfait ou remboursé de 30 jours
Expédition : 2-3 jours ouvrables