Development and Reliability Validation of J-Tubeless Installation Method for Submarine Cables in Offshore Wind Farms

https://odoo.e-cigre.org/web/image/product.template/14585/image_1920?unique=8842bd5

With the rapid expansion of offshore wind power, the installation and maintenance of submarine cable systems have become critical factors determining project reliability and lifecycle cost. In jacket-type offshore wind foundations, inter-array cables are conventionally routed through steel J-tubes and fixed at the transition piece using hang-off systems. While this approach has been widely applied, operational experience in real marine environments has revealed inherent limitations of the conventional J-tube installation method, particularly related to biofouling, installation delays, and restricted maintainability.