Se rendre au contenu

Offshore Windfarm Export Cable System Commissioning, is it fit for purpose?

https://odoo.e-cigre.org/web/image/product.template/14600/image_1920?unique=53080a1

The inability for OWFs export connections to experience initial substantial sustained load causes a problem on several fronts as the full functionality of the export circuits cannot be verified until such a load is applied. The cable system warranty period is expected to cover the elevated risk of failure (part of the bath-tub curve related to infant mortality) as the cable system is operated within its full operational window after commissioning. Historically, cable systems were subject to representative load conditions straight after connection into the grid. However the growth in the renewable sector, particularly the offshore windfarm, has meant a change in the operational regime in the majority of cases. The export cable connections are usually constructed before the whole of the wind…

30,00 € 30.0 EUR 30,00 €

Not Available For Sale

Cette combinaison n'existe pas.

Conditions générales
Garantie satisfait ou remboursé de 30 jours
Expédition : 2-3 jours ouvrables