Field Evidence and Lesson Learned from offshore Power Cable Fault finding using distributed acoustic Sensing
As the number of installed power cables, both onshore and offshore, is increasing, so is the number of electrical faults due mostly to installation and to external causes such anchors or fishing gears. Some scenarios are foreseeing as many as one fault per 100km of cable per year.