Hybrid Grid for enhancing capacity of AIS substations with space limitation with use of GIS switchgear

https://odoo.e-cigre.org/web/image/product.template/14762/image_1920?unique=dcfc3ab

A major challenge facing an urban utility like our organization is augmentation and addition of network to meet increasing load demand. A primary constraint is the availability of space, both for construction of substations and laying of new lines. We operate 66/11 kV and 33/11 kV