Se rendre au contenu

GeoBIM Implementation for the Development of Transmission Projects and Digital Twins for the Optimization of Substation Management in Operation

https://odoo.e-cigre.org/web/image/product.template/14800/image_1920?unique=9f4dfb8

This paper presents the process of digitization and georeferenced BIM modeling (GeoBIM) applied to transmission substations, based on the practical results of the effective implementation of the BIM methodology in Brazil. Since 2024, this approach has been adopted both for the contracting of new substation projects and for the digitalization of existing substations in operation, using standardized GeoBIM models managed within a Common Data