Se rendre au contenu

Constraints for real world transmission topology optimization in transmission grids

https://odoo.e-cigre.org/web/image/product.template/15168/image_1920?unique=179aea7

The integration of renewable energy sources increases congestion in transmission grids, driving up redispatch costs and carbon emissions. Transmission Topology Optimization (TTO) offers a cost-effective solution by reconfiguring grid topology through strategic switching actions.

30,00 € 30.0 EUR 30,00 €

Not Available For Sale

Cette combinaison n'existe pas.

Conditions générales
Garantie satisfait ou remboursé de 30 jours
Expédition : 2-3 jours ouvrables