Impacts of electromechanical oscillations on the operation of the Itaipu 50Hz interconnected power system

https://odoo.e-cigre.org/web/image/product.template/15208/image_1920?unique=d48c7db

Itaipu's 50Hz generators had supplied most of Paraguay's power system for almost 40 years alone, through a radial transmission system operating at 500kV and 220kV. In December 2022, a 500kV transmission line connecting Paraguay's main load center with its southern border in