Se rendre au contenu

Low-Latency Distribution Services enabled by Synchrophasor-based Control

https://odoo.e-cigre.org/web/image/product.template/15597/image_1920?unique=d21aa10

The energy transition necessitates a shift from traditional grid services delivered by large, transmission-connected plants to more distributed, variable resources. This transition introduces new dynamic requirements such as fast frequency control and stability constraints.

30,00 € 30.0 EUR 30,00 €

Not Available For Sale

Cette combinaison n'existe pas.

Conditions générales
Garantie satisfait ou remboursé de 30 jours
Expédition : 2-3 jours ouvrables