Se rendre au contenu

Influence Of Shunt Capacitor Banks On Circuit Breaker Fault Interruption Duties

http://odoo.e-cigre.org/web/image/product.template/5817/image_1920?unique=07f42c5

WG A3.26 has studied the influence of a source side capacitor bank on the Transient Recovery Voltage (TRV) of a circuit breaker interrupting a fault. EMTP simulations of different network configurations have been performed. Mitigation means are discussed to limit the possible high voltage transients the network.

20,00 € 20.0 EUR 20,00 €

Not Available For Sale

Cette combinaison n'existe pas.

Conditions générales
Garantie satisfait ou remboursé de 30 jours
Expédition : 2-3 jours ouvrables