Skip to Content

Overvoltages on HVDC Cables - Final Report

http://odoo.e-cigre.org/web/image/product.template/12490/image_1920?unique=91a056f

The number of HVDC projects using long DC cables is increasing, mostly for submarine power transmission. A larger number of such HVDC schemes are already in operation or in planning stage. The economic design of DC cables is very important, because the cost of DC cables is high in proportion to the total cost of HVDC submarine cable transmission.

120.00 € 120.0 EUR 120.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days