Skip to Content

Guidelines for insulation coordination in live working

http://odoo.e-cigre.org/web/image/product.template/12472/image_1920?unique=6883ddb

The Guide contains the main aspects to be taken into consideration in the assessment of insulation coordination during live working on overhead transmission lines; the basis rules and influence factors for the determination of the minimum distances to be maintained between parts at different potential, including the worker himself, are given as well as for the evaluation of the risk of insulation failure.

140.00 € 140.0 EUR 140.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days