Skip to Content

Installation of underground HV cable systems

http://odoo.e-cigre.org/web/image/product.template/113/image_1920?unique=4b41410

Scope of the TB is to update the Technical Brochure 194, published in 2001, discussing the civil construction and cable installation techniques implementing them with the review of existing and innovative methods for HV cable installation, including the review of the calculations and parameters necessary to perform design calculations for cable installation, such as pulling calculation and thermo-mechanical design. Mention is also made to general system design criteria. A new survey on the installation methods has also been included.

300.00 € 300.0 EUR 300.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days