Skip to Content

Fourth CIGRE international reliability survey on equipment operated in 2014-17 - Part 1: General results on transmission and distribution equipment

http://odoo.e-cigre.org/web/image/product.template/14099/image_1920?unique=ee7220d

This Technical Brochure provides a general report on the fourth CIGRE reliability survey of various equipment operated in 2014-2017 and compares the results with those of the previous surveys. The present results show a generally good service experience with a lower probability of major failures during its lifetime. WG A3.48 will publish a series of Technical Brochures for each equipment to update the reliability performance of substation equipment.

150.00 € 150.0 EUR 150.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days