Skip to Content

Field Trials of DAS-Based TPID Systems for the Monitoring of Urban Extra High Voltage Cable Systems

https://odoo.e-cigre.org/web/image/product.template/14601/image_1920?unique=ff2b453

External damage from construction activities is the leading cause of faults in Vienna’s high and extra-high voltage cable systems, threatening grid reliability and resulting in costly, lengthy repairs. Traditional preventive measures, such as cable marking and geo-information systems, have proven insufficient, as evidenced by the rising number of incidents. To address this,

30.00 € 30.0 EUR 30.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days