Skip to Content

Digital Twin Implementation for Data-Driven Planning and Assembly of 525 kV Transmission Towers in Brazil

https://odoo.e-cigre.org/web/image/product.template/14675/image_1920?unique=115471a

This paper presents a pioneering application of Digital Twin technology for the planning, logistics, and execution of transmission tower assembly in the 525 kV AC transmission line connecting Bateias and Curitiba Leste. Extending over 75 km and comprising 199 towers of 12 different types, this complex infrastructure demanded a high level of engineering detailing and site coordination. The initiative applied Building Information

30.00 € 30.0 EUR 30.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days