Implementing Eco-Design at EDF HYDRO. Guidelines for Electrical Equipment
EDF HYDRO initiated the implementation of an Eco-Design project in 2022. The project was structured around five internal working groups tasked with defining technical requirements and specifications for the main technical domains of hydro-utility activities (control systems, electrical engineering, civil works, construction site activities, mechanics and steel). The overarching objective is to reduce the environmental impact associated with these activities.