Grid code compliance within the constraint of small emission limits
Network capacity, contingencies, fault levels and background distortion support calculating how much emission can be tolerated at the Point of Connection (PoC). In the calculation of emission limits, a three times harmonic impedance factor, as well as the doubling of installed capacity, drastically reduces the harmonic emission limits that the South African utilities allocated to RPPs.