Skip to Content

Technical challenges associated with the integration of long HVAC cables and inverter based renewable generation in weak transmission networks: the Irish experience

http://odoo.e-cigre.org/web/image/product.template/4317/image_1920?unique=8e350f8

30.00 € 30.0 EUR 30.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days