Skip to Content

Reliability Evaluation for HV Substation Using Variable Failure Rate Affected by Preventive Maintenance

http://odoo.e-cigre.org/web/image/product.template/5692/image_1920?unique=356ee5a

This paper proposes the methods to evaluate reliability of HV substation by using variable failure rate affected by preventive maintenance (PM) of HV equipment such as power circuit breakers, lines and busbars. The subcomponents of individual HV equipment are firstly classified according to its function. Secondly, the Weibull distribution technique is used to determine the mean time between failure (MTBF) and time-dependent failure rate of subcomponents calculated from the 20 years historical failure record. Next, the known time-dependent failure rate and MTBF are subsequently used to setup the schedule for PM in order to calculate variable failure rate influenced by the proposed PM schedule. The subcomponents with nearly similar MTBF are grouped together and will be replaced by the new…

0.00 € 0.0 EUR 0.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days