Skip to Content

A State of the Art Overview: EHV Composite Cross-Arms and Composite-Based Pylons

http://odoo.e-cigre.org/web/image/product.template/5928/image_1920?unique=742f4d5

The first EHV composite cross-arms have been used since late 1990's in Switzerland. It was the first step to the compaction of towers sizes. Since then, significant advances have been made in composite cross-arms technology while the lattice construction technique has not been seriously challenged until now. For this reason, the next generation of overhead line is introduced to extend the European transmission grid by developing new design pylons that are easier to erect, smaller and better looking than the old ones, which is important to get public acceptance for planning of new lines. The proposed new fully composite pylon has a novel cross-arm in the form of uni-body insulator in order to reduce the tower height. So far, there is no theoretical analysis and technical standards for fully…

0.00 € 0.0 EUR 0.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days