Se rendre au contenu
Accueil
Boutique
0
+1 555-555-5556
Français
English (US)
Français
Se connecter
Contactez-nous
0
Accueil
Boutique
+1 555-555-5556
Français
English (US)
Français
Se connecter
Contactez-nous
Type de Publication
Comité d'Etudes
Par défaut
Par défaut
Trier par :
En vedette
En vedette
Nouvelles arrivées
Nom (A-Z)
Prix - Croissant
Prix - Décroissant
Methods and means of voltage regulation of large auto transformers Colloquium in Marianske Lazne 1971
20,00
€
20.0
EUR
Land based sets for very low speed large output diesel generators
20,00
€
20.0
EUR
Operational Monitoring of Air-Cooled Hydro-Generators
20,00
€
20.0
EUR
Starting methods for pump storage units
20,00
€
20.0
EUR
Summary Report on Answers to a Questionnaire concerning the Progress in the Development of Superconducting Rotating Machines, Superconducting Material and Cryogenic Equipment
20,00
€
20.0
EUR
Magnetic vibration of hydrogenerators stator core due to rotor eccentricity - rotor non circularity and negative sequence current
20,00
€
20.0
EUR
The attraction of spacerless bundle conductors due to high load currents : a calculation method and parameter study
20,00
€
20.0
EUR
Overhead lines support loadings : wind and temperature loadings.
20,00
€
20.0
EUR
Earthing of GIS - An application guide (Available as a separate brochure No. 44)
20,00
€
20.0
EUR
Fundamentals of HVDC interruption
20,00
€
20.0
EUR
Considerations on the specification of circuit-breakers intended to interrupt small inductive currents.
20,00
€
20.0
EUR
Thyristor controlled voltage regulators: Parts 1 and 2
140,00
€
140.0
EUR
Improving resilience in power control centres
60,00
€
60.0
EUR
Conductors for the uprating of overhead lines
110,00
€
110.0
EUR
New optical access technology
110,00
€
110.0
EUR
The automation of new and existing substations: why and how
220,00
€
220.0
EUR
Optimization of power transmission capability of underground cable systems using thermal monitoring
160,00
€
160.0
EUR
Integrated service networks for utilities
190,00
€
190.0
EUR
Technical and environmental issues regarding the integration of a new HV underground cable system in the network
300,00
€
300.0
EUR
The needs and environment of control centre operators during power system restoration - A benchmark questionnaire survey
70,00
€
70.0
EUR
610
611
612
613
614