Skip to Content
Home
Shop
0
+1 555-555-5556
English (US)
English (US)
Français
Sign in
Contact Us
0
Home
Shop
+1 555-555-5556
English (US)
English (US)
Français
Sign in
Contact Us
Type de Publication
Comité d'Etudes
Par défaut
Par défaut
Sort By:
Featured
Featured
Newest Arrivals
Name (A-Z)
Price - Low to High
Price - High to Low
SUBSTATION DESIGN USING PHASE TO PHASE INSULATION
30.00
€
30.0
EUR
SERVICE LIFE PROLONGATION AND RELIABILITY INCREASE OF LONG OPERATING TURBOGENERATORS
30.00
€
30.0
EUR
IEC 61850: SYSTEM CONFIGURATION INCLUDING HARMONIZATION WITH IEC 61970/IEC 61968
30.00
€
30.0
EUR
METHODOLOGY FOR THE CALCULATION OF THE LIGHTNING FLASHOVER RATE OF A LINE WITH ORWITHOUT LINE SURGE ARRESTERS
30.00
€
30.0
EUR
HAVE DEREGULATED MARKET MODELS REACHED SUFFICIENT CONVERGENCE TO BE SUPPORTED THROUGH STANDARD IT PLATFORMS ?
30.00
€
30.0
EUR
DAMAGE LIMIT OF COMPOSITE LONG ROD INSULATORS SUBJECTED TO CYCLIC LOADS
30.00
€
30.0
EUR
AUTOMATIC PD PATTERN EVALUATION AS PART OF CONDITION BASED MAINTENANCE STRATEGY
30.00
€
30.0
EUR
EXTREME STRESSES ON GENERATOR CIRCUIT BREAKERS
30.00
€
30.0
EUR
ENERGY EFFICIENCY OF SMALL INDUCTION GENERATORS
30.00
€
30.0
EUR
TRAINING OPERATORS TO ACUTE SYSTEM CONTINGENCIES
30.00
€
30.0
EUR
LIVE WORKING DEVELOPMENT FOR EGAT'S 500 KV COMPACT LINE IN THAILAND
30.00
€
30.0
EUR
MAGNETICALLY CONTROLLED SHUNT REACTOR APPLICATION FOR AC HV AND EHV TRANSMISSION LINES
30.00
€
30.0
EUR
MODERN SYSTEM PROTECTION SCHEMES REALIZATION IN LARGE HYDRO POWER PLANT AUTOMATION: LOCAL AND SYSTEM ASPECTS
30.00
€
30.0
EUR
PRINCIPLES OF INVESTMENT POLICY AND DRIVERS IN INVESTMENT IN RUSSIA'S ELECTRIC POWER INDUSTRY
30.00
€
30.0
EUR
ENSURING RELIABLE OPERATION OF INFO-COMMUNICATION SYSTEMS UNDER PRE-EMERGENCY AND EMERGENCY SITUATIONS IN THE POWER UTILITIES AND THEIR REAL-TIME PROTECTION AGAINST UNAUTHORIZED INFLUENCE
30.00
€
30.0
EUR
EXPERIENCE OF LONG OPERATED HYDROGENERATOR REFURBISHMENT AND RECONSTRUCTION
30.00
€
30.0
EUR
MAINTAINING SYSTEM INTEGRITY TO PREVENT CASCADING BLACKOUT
30.00
€
30.0
EUR
THE NEW TURBIGO-RHO 380 KV TRANSMISSION LINE : AN EXAMPLE OF THE USE OF UNDERGROUND XLPE CABLES IN A MESHED TRANSMISSION GRID
30.00
€
30.0
EUR
A NEW PROCEDURE TO COMPARE THE SOCIAL COSTS OF EHV-HV OVERHEAD LINES AND UNDERGROUND XLPE CABLES
30.00
€
30.0
EUR
A 400 KV OHTL IN MEXICO FACING PARTICULAR RELIABILITY, ENVIRONMENTAL AND DESIGN PROBLEMS.
30.00
€
30.0
EUR
399
400
401
402
403