Se rendre au contenu

Linking bottom-up and top-down prognosis in integrated distribution grid expansion planning

https://odoo.e-cigre.org/web/image/product.template/15150/image_1920?unique=8359aca

In compliance with §14d of the German Energy Industry Act (EnWG), distribution system operators (DSOs) must prepare biennial grid expansion plans (Netzausbauplan, NAP) aligned with transmission system operators’ (TSOs) top-down development plans

30,00 € 30.0 EUR 30,00 €

Not Available For Sale

Cette combinaison n'existe pas.

Conditions générales
Garantie satisfait ou remboursé de 30 jours
Expédition : 2-3 jours ouvrables