Skip to Content

Linking bottom-up and top-down prognosis in integrated distribution grid expansion planning

https://odoo.e-cigre.org/web/image/product.template/15150/image_1920?unique=8359aca

In compliance with §14d of the German Energy Industry Act (EnWG), distribution system operators (DSOs) must prepare biennial grid expansion plans (Netzausbauplan, NAP) aligned with transmission system operators’ (TSOs) top-down development plans

30.00 € 30.0 EUR 30.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days