Se rendre au contenu

System Strength and Inertia Scarcities: A Comprehensive Assessment of the Chilean Power System Towards High IBR Penetration

https://odoo.e-cigre.org/web/image/product.template/15430/image_1920?unique=d8f4fdc

The Chilean National Electric System is rapidly transitioning towards high penetration of inverter-based resources, which leads to the displacement of synchronous generation. This evolution can reduce short-circuit strength and inertia, increasing the likelihood of weak-grid behaviour and control interactions during disturbances, while the national technical framework for IBR performance continues to evolve.

30,00 € 30.0 EUR 30,00 €

Not Available For Sale

Cette combinaison n'existe pas.

Conditions générales
Garantie satisfait ou remboursé de 30 jours
Expédition : 2-3 jours ouvrables