Skip to Content

Operational insights from the ±320 kV VSC HVDC Cable System: Metallic Pipeline crossing challenges and Thermal Performance Assessment

https://odoo.e-cigre.org/web/image/product.template/14522/image_1920?unique=434bba6

± 320 kV HVDC link between Pugalur in Tamil Nadu and Thrissur in Kerala is 165.2 km long and the power evacuation is by hybrid transmission technology, which is a combination of 138 km overhead line and 27.2 km underground cable with a transition station for conversion of overhead line to underground cable system. The link connects two symmetric monopoles at

30.00 € 30.0 EUR 30.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days