Case study: Stock-up strategy for equipment with High-Lead-Time spares in offshore substations

https://odoo.e-cigre.org/web/image/product.template/14812/image_1920?unique=eb4c36b

The current paper proposes a spare parts strategy, formulated and evaluated through reactive and proactive methods, for high voltage gas insulated switchgear with a low-redundancy design as found in offshore substations due to space and weight constraints. Certain existing literature suggests that proactive spare parts methods do not significantly improve transmission assets performance, whilst other studies indicate that stockouts increase unplanned outage hours.